| Pre-development | Forecast | Measured | |
| Electricity use | - | 10548 kWh/yr | 7976 kWh/yr |
|---|---|---|---|
| Natural gas use | - | - | - |
| Oil use | - | - | - |
| LPG use | - | 200 kWh/yr | - |
| Wood use | - | - | 3180 kWh/yr |
| bottled LPG | - | - | 697 kWh/yr |
| Pre-development | Forecast | Measured | |
| Primary energy requirement | - | 108 kWh/m².yr | 98 kWh/m².yr |
|---|---|---|---|
| Annual CO₂ emissions | - | 26 kg CO₂/m².yr | 20 kg CO₂/m².yr |
| Annual space heat demand | - | 40 kWh/m².yr | 32 kWh/m².yr |
| Electricity generation | Forecast | Measured |
|---|---|---|
| Solar PV | - | 830 kWh/yr |
| Other Renewables Tech | - | - |
| Electricity consumed by generation | - | - |
| Primary energy requirement offset by renewable generation | 108 kWh/m².yr | 90 kWh/m².yr |
| Annual CO₂ emissions offset by renewable generation | 26 kg CO₂/m².yr | 18 kg CO₂/m².yr |
| Whole house energy calculation method | OTHER |
|---|---|
| Other whole house calculation method | Self developed spreadsheet. |
| Energy target | AECB Silver |
| Other energy targets | None |
| Forecast heating load | 14 W/m² demand |
| Date | Result | |
| Pre-development air permeability test | - | - |
|---|---|---|
| Final air permeability test | 15 April 2008 | 4.8m³/m².hr @ 50 Pascals |
| Stage | Occupied |
|---|---|
| Start date | 01 September 2008 |
| Occupation date | 01 May 2012 |
| Location | Gartocharn, Loch Lomond Strathclyde Scotland |
| Build type | New build |
| Building sector | Private Residential |
| Property type | Detached |
| Construction type | Softwood frame |
| Other construction type | Hybrid timber frame (over-clad TF with service void) |
| Party wall construction | n/a |
| Floor area | 246 m² |
| Floor area calculation method | Actual Floor Area (SAP) |
| Building certification |
| Organisation | Steve and Deborah Macken |
|---|---|
| Project lead person | Steve and Deborah Macken |
| Landlord or Client | Steve and Deborah Macken |
| Architect | Thomas Robinson Architects, Blanefield |
| Mechanical & electrical consultant | Steve Macken |
| Energy consultant | Ecoliving and Anderson Floor Warming, Glasgow |
| Structural engineer | Hannah Reed, Glasgow |
| Quantity surveyor | n/a |
| Consultant | n/a |
| Contractor | Robert Chalmers Builders, Lenzie |
| Planned occupancy | 4 people |
|---|---|
| Space heating strategy | Underfloor heating on ground floor and 1st floor bathrooms only. Bathrooms all have 150W electric towel radiators. Wood stove in living room for additional comfort/cosiness in winter. |
| Water heating strategy | All from ground source heat pump. |
| Fuel strategy | Maily electricty and occassionally wood during cold winter evenings only. |
| Renewable energy strategy | 1.08kWpk grid connected solar PV installed on woodshed roof. This has been replaced with a 3.6kW solar PV asystem in December 2011. |
| Passive Solar strategy | Glazing maximised on south and west facing rooms, these being main living spaces. |
| Space cooling strategy | High thermal mass concrete floor slab. |
| Daylighting strategy | 53% glazing WNW elevation (daytime and evening living space), 31% SSW elevation (main daytime living space) and 16% ESE elevation (mainly circulation areas). |
| Ventilation strategy | MVHR, high level rooflights opened during very hot days to induce passive stack ventilation. |
| Airtightness strategy | OSB and polyethylene membrane with taped and batten trapped joints with 25mm service void. |
| Strategy for minimising thermal bridges | Floor - concrete slab supported on minimum area of thermal blocks and 200mm polystyrene.. Walls - External overcladding of timber frame with 60mm T&G woodfibre board; Roof - I-beam rafters. |
| Modelling strategy | Calculations in self-developed spreadsheet. |
| Insulation strategy | 200mm polystyrene under 150mm concrete raft floor, 140mm Rockwool flexi + 60mm Pavertherm Plus for external walls, 350mm Rockwool Flexi between i-beam roof rafters. |
| Other relevant retrofit strategies | n/a |
| Contextual information |
| Occupancy | Occupied most days of the week as the owners woork from home. |
|---|---|
| Space heating | 5kW ground source heat pump using 300m single circuit groud loop located in adjacent field. |
| Hot water | Ground source heat pump as above. |
| Ventilation | MVHR |
| Controls | Internal thermostat and external weather compensation thermostat. |
| Cooking | Gas (bottled LPG) hob, electric oven and microwave oven. |
| Lighting | 80% (by fittings) compact flourescent, 10% LED and 10% tungsten filament (cupboards, task lighting). |
| Appliances | A+ rated fridge-freezer, A rated washing machine, A rated tumble dryer, A rated oven and microwave. |
| Renewable energy generation system | 1.08kWpk solar PV grid connected when built, now 3.6kW. |
| Strategy for minimising thermal bridges | Over-cladding of timber frame with woodfibre board. |
| Storeys | 2 |
|---|---|
| Volume | 1500m³ |
| Thermal fabric area | 547 m² |
| Roof description | 45 degree pitched roof. Ridge-beam and rafter construction with ridge beam supported on steel portal frames. 15mm plasterboard over poyethylene air-vapour membrane on 356mm deep timber I-beam rafters at 400mm centres fully filled with Rockwool Flexi; softwood sarking board, breather membrane and natural slate finish. |
| Roof U-value | 0.12 W/m² K |
| Walls description | 15mm taped plasterboard on 25mm battens to form service void; polyethylene air-vapour membrane taped and mechanically trapped below battens; 9mm OSB on 140mm studs fully filled with Rockwool Flexi; continuous T&G Pavatherm Plus woodfibre board with breather membrane. Part clad in untreated north European larch, otherwise rendered brick. |
| Walls U-value | 0.19 W/m² K |
| Party walls description | n/a |
| Party walls U-value | 0.00 W/m² K |
| Floor description | 150mm concrete slab on 200mm polystyrene, supported at edges on footings via thermal blocks. |
| Floor U-value | 0.14 W/m² K |
| Glazed doors description | Timber framed sliding door units; low-e argon filled 16mm glazing units. |
| Glazed doors U-value | 1.50 W/m² K installed |
| Opaque doors description | Timber framed with insulated security panel. |
| Opaque doors U-value | 1.50 W/m² K installed |
| Windows description | Timbr framed, low-e argon filled glazing units with 16mm gap. |
| Windows U-value | 1.40 W/m² K installed |
| Windows energy transmittance (G-value) | - |
| Windows light transmittance | - |
| Rooflights description | Velux timber framed double glazed windows. |
| Rooflights light transmittance | - |
| Rooflights U-value | 1.50 W/m² K |